Overhead look onto Brighton Beach, overlooking rigs, crain and the ocean

Brighton Marina to River Adur Coastal Defence Scheme

Spanning a 9km coastline from Shoreham Port to Brighton Marina, the Brighton Marina to River Adur Coastal Scheme ground investigation aimed at bolstering coastal defences to mitigate long-term flood and erosion risks in light of predicted sea level rises from climate change. This project underscores a collaborative venture between Concept and its sister company IN-SITU under Phenna Group, tackling complex geotechnical challenges.

Continue Reading
Rotary rig set up on site in front of a building

Liverpool Festival Gardens Phase 3

Geo-environmental Ground Investigation to determine underlying ground conditions on a disused historic landfill site which was redeveloped and landscaped in the 1980s to become a leisure park known as Festival Park.

Continue Reading

Washpool WTW

The purpose of the investigation was to understand the ground and groundwater conditions at the site and to determine the nature and extent of any ground and groundwater contamination.

Continue Reading
Site operative doing a survey on a run down building

Acton Feasibility Study

Concept became involved with this project at the pre-feasibility design stage where the client required two possible locations for the new Operation Control Centre (OCC) to be assessed.

Continue Reading

M20 Junction 10A

Concept were the main site investigation contractor for projects carried out for BBMMJV (Balfour Beatty Mott Macdonald Joint Venture) on the AREA 4 Highways Agency MAC Framework.

Continue Reading